Blank TemplateBlank Full Grid TemplateFull Grid, All Power Plants with Power GridFull Environment TemplateOil ChannelOil Channel with Power GridWind Turbines with Power GridSolar Panels with Power GridPath of Least ResistanceDesertDesert, Geothermal with Power GridDesert, Coal Plant with Power GridOceanOcean with Offshore PlatformRiver, Hydroelectric with Power GridForestForest, Sodium-Cooled Fast Reactor with Power Grid
$0.0M

525 kV HVDC routing puzzle

Path of Least Resistance

Connect the solar converter to the data center. Place waypoints to build a trenched route through the survey area.

Route in progress

Click or tap terrain to place a waypoint.

Illustrative project cost

$0.0M

Trench
$0.0M
Terrain
$0.0M
Crossings
$0.0M
Bends
$0.0M
ROW savings
$0.0M

Illustrative game costs—not an engineering estimate.

Cost guide

  • Standard trench$4.0M / unit
  • Slope+$2.0M / unit
  • Rock+$4.0M / unit
  • River crossing+$12.0M
  • Intermediate bend+$1.5M
  • Road, rail, transmission ROW−85% trench

Protected land and structures are unavailable.